Questions in Parliament
Questions in Parliament

RENEWAL OF RAILWAY TRACKS

RAILWAYS (SHRI MANOJ SINHA)  8 December 2014 ·  228 words

08/December/2014

GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
LOK SABHA
UNSTARRED QUESTION NO: 2422
ANSWERED ON:  08.12.2014
RENEWAL OF RAILWAY TRACKS
SHASHI THAROOR
 
Will the Minister of

RAILWAYS be pleased to state:-

(a) whether the Railways have laid down any criteria for determining the renewal of railway tracks in the country; 

(b) if so, the details thereof; 

(c) whether the Railways have any proposal to increase the spending on renewal of railway tracks in the South Railway Zone; 

(d) if so, the details thereof; and 

(e) the steps taken by the Railways in this regard?

ANSWER
MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI MANOJ SINHA) 

(a) & (b) Yes, Madam. Track renewal is a continuous activity, which is to be undertaken as and when a stretch of track becomes due for renewal on the basis of criteria laid down in Indian Railway Permanent Way Manual viz. traffic carried in terms of Gross Million Tonnes, incidence of rail fractures/failures, wear of rails, maintainability of track to prescribed standards etc. 

(c) to (e) Track renewal works are being taken up every year on age-cum-condition basis as per need to ensure safety of passengers. Funds are being provided commensurate with availability of resources. As such, there is no proposal to increase spending on renewal of railway tracks in Southern Railway. 

© 2026 Dr. Shashi Tharoor, M.P.  ·  All rights reserved  ·  TharoorSpeak  ·  Designed by Ozinexus Technologies